We program, integrate and modularise buildings.

 

digitales bauen® engineering method:

simplify

Simplification is a first step to get complexity under control: We analyse and divide buildings in manageable few, repetitive standard areas. Planning processes are bundled and controllable. The amount of data required is significantly reduced.


reduce complexity

Modular planning reduces the complexity of buildings:
Clash prevention rather than clash management.


modular BIM

Compared to conventional BIM, the amount of data in modular BIM is reduced by a factor of 20.


program

In the digitales bauen® method plans are not drawn, but recorded in databases. This enables us to react quickly to planning changes; only parameters, but not the whole plan needs to be revised.


reduce complexity

Compared to conventional planning, modular planning can reduce the complexity of a project by up to 80%.


integrate

digitales bauen® provides integration guidelines, and verifies adherence to these restrictions.

 


modularise

We combine construction details into groupings. These are then manufactured by external production facilities. The advantages: higher quality, lower unit costs, shorter construction times.


reduce construction costs

Modular planning reduces overall cost by up to 20%


adapt

In the digitales bauen® method, changes or adaptations are simply a matter of parametric changes.
(image source: D’Arcy Wentworth Thompson, On growth and form, Campridge 1917)

 

 


guide safely

Our integrated plans are like road maps. They guide installation with assured exactness. Integrated plans are not just an overview. They are unambiguous and comprehensive.  The  room for flexibility within the individual planning disciplines is clearly defined.

 


program rather than draft

We analyse and program your design, and configure it into an optimised architectural form.


shorten construction time

Prefabrication can shorten construction times by up to 40%


prefabricate